|
By demand, we have produced a ceiling eyebolt kit designed for wooden joists above a dropped ceiling.
Similar in design to our metal pre-fab joist kit (item # 7050), it includes all the hardware you need to complete the installation. Simply measure the distance from the bottom of your joist to your dropped ceiling, then order the appropriate kit:
Working Load: 1000 lbs
- Order Kit #1 if the distance from your joist to the dropped ceiling is less than 2-1/2 feet
- Order Kit #2 if the distance from your joist to the dropped ceiling is 2-1/2 feet or more
Additional Images

|